首页> 外文期刊>Building >Erinaceous 'overpaid' on Medway contract
【24h】

Erinaceous 'overpaid' on Medway contract

机译:Medway合同上的Erinaceous“超额支付”

获取原文
获取原文并翻译 | 示例
       

摘要

Failed property consultant Erinaceous was systematically overpaid for work carried out on a four-year housing maintenance contract in Kent, an investigation into alleged fraud has found. An internal report by Medway council concludes that there was "no evidence of fraud or dishonesty" by the council or Erinaceous Property Management. However, it reveals that Erinaceous was overpaid for work including repairs and capital works during 2007/08. The report says the council will withhold payments to redress some of the sums lost on the £4.4m a year contract, including an estimated £168,930 relating to the installation of kitchens. However, it concludes that it will not be able to claim back £155,000 lost on roofs and boilers.
机译:一项针对涉嫌欺诈的调查发现,失败的房地产顾问Erinaceous因在肯特进行的为期四年的房屋维护合同而进行的工作,被系统性地多付了工资。 Medway理事会的内部报告得出的结论是,理事会或Erinaceous Property Management没有“欺诈或不诚实的证据”。但是,它显示Erinaceous在2007/08年度因包括修理和基本工程在内的工作而被多付了薪水。报告说,议会将扣留款项,以弥补每年440万英镑合同中的部分损失,其中包括与厨房安装有关的估计168,930英镑。但是,它得出的结论是,它将无法赔偿屋顶和锅炉损失的155,000英镑。

著录项

  • 来源
    《Building》 |2008年第25期|p.14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:37:19

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号