首页> 外文期刊>Building >Cost model Schools
【24h】

Cost model Schools

机译:成本模型学校

获取原文
获取原文并翻译 | 示例
       

摘要

Building Schools for the Future (BSF), launched in 2004 as a long-term strategic investment programme, has evolved into a 15-year, ?5bn project to replace or upgrade all of England's 3,500 secondary schools. BSF cannot come too soon for England, with six out of seven schools being more than 25 years old, approaching the end of their physical life, and increasingly unsuitable for delivering modern education. BSF has consequently become the major driver behind "transformational learning", aimed at increasing pupil engagement and improving the quality of education. The building programme has bought great opportunities and challenges to education clients as they seek to deliver space that responds to a 21st-century vision of pupil-centred, flexible education. The local education authorities (LEAs) involved in the first waves of BSF schools have faced some of the greatest challenges in terms of pupil attainment and their own management resources, so it is not surprising that BSF has been slow to get started.
机译:未来的学校建设(BSF)于2004年启动,是一项长期的战略投资计划,现已发展成为一个为期15年,耗资50亿欧元的项目,以取代或升级英格兰所有3500所中学。 BSF对于英国来说不能太早,因为七分之六的学校已有25年以上的历史,正接近他们的身体寿命即将结束,并且越来越不适合提供现代教育。因此,BSF已成为“变革性学习”背后的主要推动力,其目的是提高学生的参与度并提高教育质量。该建筑计划给受教育的客户带来了巨大的机遇和挑战,他们寻求提供空间以响应21世纪以学生为中心的灵活教育的愿景。参与BSF学校第一波工作的地方教育当局(LEA)在学生的学历和自己的管理资源方面面临着一些最大的挑战,因此,BSF的起步缓慢并不奇怪。

著录项

  • 来源
    《Building》 |2008年第16期|p.90-94|共5页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:37:13

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号