首页> 外文期刊>Building >OUTSTANDING NOVATION
【24h】

OUTSTANDING NOVATION

机译:卓越的创新

获取原文
获取原文并翻译 | 示例
       

摘要

Clients using design and build as the means of procuring their projects often intend that the professional team should be novated to the design and build contractor once the building contract is let. This may well have been discussed and agreed in principle with the consultants and the contractor at an early stage. But uncertainties over the contractual position of the parties can arise if at some point in the project - usually during the tender stage - they start to act as if the novation has taken place when in fact no formal deed of novation or new appointment between the contractor and the consultant is ever entered into.
机译:使用设计和建造作为其项目采购手段的客户通常希望,一旦签订建筑合同,就应该对专业的团队进行设计和建造承包商的创新。在早期阶段,这可能已经与顾问和承包商进行了原则上的讨论和同意。但是,如果在项目的某个时候(通常在招标阶段),当事各方开始采取行动时就好像是在进行革新,而实际上在承包商之间没有正式的革新契约或新的任命时,各方的合同地位可能会出现不确定性。顾问就被聘请了。

著录项

  • 来源
    《Building》 |2010年第48期|p.45|共1页
  • 作者

    Rachel Barnes;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:36:13

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号