首页> 外文期刊>Building >BROADCASTING HOUSE: THE STORY SO FAR
【24h】

BROADCASTING HOUSE: THE STORY SO FAR

机译:广播公司:如此遥远的故事

获取原文
获取原文并翻译 | 示例
           

摘要

The plan to redevelop and upgrade the BBC's headquarters, Broadcasting House, was approved by BBC governors in 2003. Phase one of the project involved the refurbishment of the grade ll-listed Old Broadcasting House to incorporate more resilient studios, modern services, more internal space and the latest broadcasting technology. By the beginning of 2005, however, this part of the scheme had already fallen 11 months behind schedule. This was owing to a number of factors, including cost overruns and changing briefs - the first of the 42 contract variations that the National Audit Office noted in its report released last month. To make matters worse, Easton Masonry, the contractor employed to install the Portland stone facade, went bust.
机译:英国广播公司(BBC)州长于2003年批准了BBC总部广播大厦的重建和升级计划。该项目的第一阶段涉及翻新等级为ll的老广播大厦,以合并更具弹性的工作室,现代服务和更多内部空间以及最新的广播技术。但是,到2005年初,该计划的这一部分已经比原计划落后了11个月。这是由于许多因素造成的,包括成本超支和变更摘要,这是国家审计署在上个月发布的报告中指出的42个合同变更中的第一个。更糟的是,安装波特兰石材立面的承包商伊斯顿·石工(Easton Masonry)破产了。

著录项

  • 来源
    《Building》 |2010年第10期|22|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号