首页> 外文期刊>Building >AVOIDING COST OVERRUNS AND WASTE ON PFI PROJECTS
【24h】

AVOIDING COST OVERRUNS AND WASTE ON PFI PROJECTS

机译:避免PFI项目的成本超支和浪费

获取原文
获取原文并翻译 | 示例
       

摘要

The Test: For a critique of the problems associated with PFI schools in the past, look no further than Michael Gove himself. The education secretary once described the Building Schools for the Future programme - which involved a heavy PFI element - as "characterised by massive overspends, tragic delays, botched construction projects and needless bureaucracy" He said last week that his new PFI-based schools programme would be policed to avoid the cost and time overruns associated with PFI schemes in the past. The question is, how?
机译:测试:对于过去与PFI学校相关的问题的批评,迈克尔·戈夫本人就是其中之一。这位教育部长曾经描述了“建设未来的学校计划”,其中涉及大量的PFI要素,“其特点是超支,悲惨的延误,不良的建设项目和不必要的官僚主义”。他上周表示,他基于PFI的新学校计划将受到监管以避免过去与PFI计划相关的成本和时间超支。问题是,如何?

著录项

  • 来源
    《Building》 |2011年第30期|p.21|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:35:25

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号