首页> 外文期刊>Building >An alternative method
【24h】

An alternative method

机译:另一种方法

获取原文
获取原文并翻译 | 示例
       

摘要

Another Scottish company, Campbell Construction Group (CCG), has also delivered a Passivhaus housing scheme using an offsite system at Dormont Park in Dumfriesshire. Called iQ, this system can be specified to conform with Building Regulations or to meet the much more demanding Passivhaus standard, depending on the width of structural studs - a Part L compliant scheme uses 140mm-wide studs but the scheme built to Passivhaus used 260mm-wide space studs. The studs are assembled into panels up to 10m long and 3.2m high in CCG's factory and can be supplied with plasterboard, external sheathing board and doors and windows already installed.
机译:苏格兰的另一家公司,坎贝尔建设集团(CCG),也使用非现场系统在邓弗里斯郡的多蒙公园提供了Passivhaus住房计划。称为iQ的系统可以指定为符合建筑法规或满足更苛刻的Passivhaus标准,具体取决于结构钉的宽度-符合L部分的方案使用140mm宽的钉,而为Passivhaus建造的方案使用260mm-宽大的螺柱。 CCG的工厂将这些螺柱组装成最长10m,高度3.2m的面板,并可以提供石膏板,外部护套板和已安装的门窗。

著录项

  • 来源
    《Building》 |2012年第41期|p.57|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:34:57

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号