首页> 外文期刊>Building >A bridge too far
【24h】

A bridge too far

机译:一座桥太远

获取原文
获取原文并翻译 | 示例
           

摘要

Sappers from Tidworth-based 22 Engineer Regiment have repaired a key bridge in the Lashkar Gah district of Helmand Province in Afghanistan. Basharan Bridge, which was first built in 2010, crosses the Char Anjir Wadi linking local communities in the Basharan and Babaji areas. The bridge allows farmers from Babaji to move their produce to markets and makes moving between local towns more efficient. The bridge had been damaged by an improvised explosive device laid by insurgents earlier this year. The sappers, from 5 Squadron, mounted a two-day operation to fix the bridge in the soaring Afghan heat.
机译:来自位于蒂德沃思的22工程团的工兵们修复了阿富汗赫尔曼德省拉什卡尔加区的一座关键桥梁。 Basharan桥始建于2010年,横跨Char Anjir Wadi,连接Basharan和Babaji地区的当地社区。这座桥使巴巴吉的农民能够将其农产品运到市场,并提高了在当地城镇之间的转移效率。今年早些时候,叛乱分子使用简易爆炸装置炸毁了这座桥。来自第5中队的工兵进行了为期两天的手术,将这座桥固定在阿富汗热浪中。

著录项

  • 来源
    《Building》 |2013年第37期|14-14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号