首页> 外文期刊>Building >Nuclear head quits Laing
【24h】

Nuclear head quits Laing

机译:核子头离开了莱恩

获取原文
获取原文并翻译 | 示例
       

摘要

Laing O'Rourke's head of new nuclear, who played a key role in the firm winning the £2bn Hinkley civils package, Norman Haste, has retired from the firm. Haste returned to Laing O'Rourke UK after three years heading up the firm's work in the Middle East to play a key role in winning the Hinkley Point civils package. He was project director on the construction of Sizewell B nuclear plant in the eighties and worked on the Severn Bridge crossing. Roger Robinson has now taken over as head of the firm's new nuclear operations while retaining his role as chief executive of Laing O'Rourke's Europe Hub.
机译:Laing O'Rourke的新核电负责人在该公司赢得了价值20亿英镑的Hinkley民事一揽子计划中扮演了重要角色,Norman Haste已从该公司退休。赫斯特(Haste)在领导该公司在中东的工作三年之后,回到了Laing O'Rourke UK,在赢得欣克利角(Hinkley Point)民事一揽子计划中发挥了关键作用。他在80年代曾担任建设Sizewell B核电站的项目总监,并在Severn Bridge交叉口工作。罗杰·罗宾逊(Roger Robinson)现在已接任该公司新核部门的负责人,同时保留了他在Laing O'Rourke欧洲枢纽首席执行官的职位。

著录项

  • 来源
    《Building》 |2013年第19期|9-9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:34:11

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号