Wading through the average planning application can be a time-consuming task, but I was alarmed to learn this week that reading the full application for the Thames super sewer from cover to cover would take you around two-and-a-half years, according to the project's boss. Phil Stride, head of London Tideway Tunnels at Thames Water, informed attendees at an event on the project hosted by New London Architecture last week that you would also have to read six pages a minute to achieve that time. It's no wonder the Planning Inspectorate has five inspectors and nine other staff members sifting through the application's 55,000 pages.
展开▼
机译:遍历一般的计划应用程序可能是一项耗时的工作,但本周令我震惊的是,从头到尾阅读泰晤士超级下水道的完整应用程序将花费大约两年半的时间。给项目的老板。泰晤士水务公司伦敦潮间带隧道负责人菲尔·斯特雷德(Phil Stride)在上周由新伦敦建筑公司(New London Architecture)主持的项目活动中向与会人员表示,要达到这个时间,您还必须每分钟阅读六页。毫无疑问,计划检查局有五名检查员和九名其他工作人员在应用程序的55,000页中进行筛选。
展开▼