首页> 外文期刊>Building >CITY OF SUNDERLAND COLLEGE
【24h】

CITY OF SUNDERLAND COLLEGE

机译:桑德兰学院市

获取原文
获取原文并翻译 | 示例
       

摘要

"We were at approval-in-principle stage with our proposed development when the Building Colleges for the Future funding collapsed. We'd actually bought some land to develop when it was pulled from under our feet. "We obviously had design and consultancy fees to cover as well. It was a huge development - around £100m - that we were proposing. We spent around Elm on consultants' fees. With the land we actually made a small profit when we sold it. However, we didn't get any of the Elm back from the Learning and Skills Council.
机译:“当未来的建筑学院资金崩溃时,我们的拟议开发工作正处于原则批准阶段。实际上,当我们从脚下拉开时,我们实际上已经购买了一些土地进行开发。”显然,我们有设计和咨询费也涵盖。我们提议的是一个巨大的发展-大约1亿英镑。我们在榆树周围花了顾问费。有了土地,我们实际上在出售时获得了微薄的利润。但是,我们没有从学习与技能委员会那里得到任何榆木。

著录项

  • 来源
    《Building》 |2013年第13期|34-34|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:34:10

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号