首页> 外文期刊>Building >A PREMIUM PROCESS?
【24h】

A PREMIUM PROCESS?

机译:高级流程?

获取原文
获取原文并翻译 | 示例
       

摘要

The target for all central government contracts above £5m to use BIM level 2 by 2016 has galvanised uptake of this previously niche technology, and now companies across the construction industry are looking to see how they can use Building Information Modelling to drive efficiencies in design and construction processes. The promise of BIM is of design teams collaborating seamlessly over virtual models of structures before they've been built, detecting any clashes before construction starts, and recording who has done what and when. So it is natural that BIM has excited much interest around its implications for the cost of insurance: if the risks of projects running into problems can be reduced, and responsibility for mistakes can be pinpointed more quickly, then surely the adoption of BIM could reduce personal indemnity insurance premiums?
机译:到2016年所有超过500万英镑的中央政府合同都将使用BIM 2级的目标刺激了这种先前利基技术的普及,如今建筑行业的公司正在寻找如何使用建筑信息模型来提高设计和施工效率的方法。施工过程。 BIM的承诺是设计团队在构建虚拟模型之前就它们进行无缝协作,在构建开始之前检测出任何冲突,并记录谁在何时何地进行了操作。因此,很自然地,BIM对它对保险成本的影响引起了极大的兴趣:如果可以减少项目遇到问题的风险,并且可以更快地确定错误责任,那么BIM的采用肯定可以减少人身伤害。赔偿保险费?

著录项

  • 来源
    《Building》 |2014年第11期|43-43|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:33:41

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号