首页> 外文期刊>Building >Battersea developer kicks up stink over Thames'super-sewer'
【24h】

Battersea developer kicks up stink over Thames'super-sewer'

机译:巴特西开发商对泰晤士河超级下水道产生臭味

获取原文
获取原文并翻译 | 示例
       

摘要

The construction of the £4.1bn Thames "super-sewer" would endanger the £8bn restoration and redevelopment of London's Battersea Power Station and make a whole tranche of apartments planned for the site "unsellable", the power station's developer has claimed. In a submission to the Planning Inspectorate - which is considering whether to grant the super-sewer's developer Thames Water permission to build the tunnel - the developer of Battersea Power Station also said the tunnel's construction programme would jeopardise funding for the £600m Northern line extension.
机译:该发电站的开发商声称,斥资41亿英镑的泰晤士河“超级下水道”的建设将危及伦敦的巴特西发电站80亿英镑的恢复和重建,并使计划用于该地点的全部公寓“卖不出去”。在向规划检查局提交的文件中-正在考虑是否授予超级污水管道开发商的泰晤士水务公司建造隧道的权限-巴特西发电站的开发商还表示,该隧道的建设计划将损害6亿英镑北线扩建的资金。

著录项

  • 来源
    《Building》 |2014年第3期|13-13|共1页
  • 作者

    Vern Pitt;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:33:36

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号