首页> 外文期刊>Building >HANSON AS TIME GOES BY
【24h】

HANSON AS TIME GOES BY

机译:汉森随着时间的流逝

获取原文
获取原文并翻译 | 示例
       

摘要

The longest-running project in the history of construction - Antoni Gaudi's masterful Sagrada Familia cathedral in Barcelona - is finally entering the conclusive phase of construction, in its 133th year on site. The basilica is to have six new towers added to it, completing the work begun by Gaudi in 1882. This final stage of the build is on track for completion in 2026 to coincide with the centenary of Gaudi's death. However, decorative elements could take up to 2032 to complete. I have watched this project with relish since the beginning. It surely serves as proof to any battle-scarred developers out there that good things do come to those who wait!
机译:建筑历史上运行时间最长的项目-安东尼·高迪(Antoni Gaudi)精湛的巴塞罗那圣家堂(Sagrada Familia)大教堂–在建址的第133年终于进入建设性决定性阶段。大教堂将增加六座新塔,以完成1882年高迪开始的工作。该建筑的最后阶段有望在2026年完成,以纪念高迪逝世一百周年。但是,装饰元素最多可能需要2032年才能完成。从一开始,我就津津乐道地观看了这个项目。无疑,它可以证明所有受过战争折磨的开发人员都可以为等待的人带来好消息!

著录项

  • 来源
    《Building》 |2015年第43期|19-19|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:33:29

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号