首页> 外文期刊>Building >Firms eye £6bn Houses of Parliament job
【24h】

Firms eye £6bn Houses of Parliament job

机译:企业关注60亿英镑的国会大厦工作

获取原文
获取原文并翻译 | 示例
       

摘要

A raft of construction firms including Mace, Bechtel and Arup are all eyeing potential bids for work on the up to £6bn restoration and renewal of the Houses of Parliament, Building has learned, writes Louise Dransfield. Last week Deloitte Real Estate, Aecom and HOK published a long-awaited report commissioned by both Houses of Parliament into potential strategic options for the renewal of the grade Misted buildings. The study laid out three options for the work costing between £4bn and £6bn and taking up to 30 years to complete. The consultancy trio warned major irreversible damage could be done to the palace unless significant restoration work is undertaken soon.
机译:据路易丝·德拉恩斯菲尔德写道,据梅斯大厦了解,包括梅斯,贝克特尔和奥雅纳在内的众多建筑公司都在潜在地竞标可能耗资60亿英镑的国会大厦的修复和更新工作。上周,德勤房地产,Aecom和HOK发表了一份期待已久的报告,由国会两院委托,提出了更新有雾建筑等级的潜在战略选择。该研究为这项耗资40亿至60亿英镑,耗时30年的工程提出了三种选择。顾问三人组警告说,除非很快进行大规模的修复工作,否则将对宫殿造成不可挽回的重大损害。

著录项

  • 来源
    《Building》 |2015年第25期|10-10|共1页
  • 作者

    Mark Leftly;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:33:18

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号