首页> 外文期刊>Building >Rival firms brace for flood of CVs as Kier sheds 1,200 staff
【24h】

Rival firms brace for flood of CVs as Kier sheds 1,200 staff

机译:竞争对手公司支撑CVS洪水,因为凯尔棚1,200名员工

获取原文
获取原文并翻译 | 示例
       

摘要

Rival contractors say they expect to see a flood of CVs from Kier staff in the coming days after the firm this week said it was getting rid of 1,200 people in a drastic cost-cutting programme. New chief executive Andrew Davies shocked peers when he said 650 staff would be gone by the end of this month. A rival tier one chief executive said: "It might be necessary but it's the message it sends. With that sort of speed, everyone will feel in jeopardy. We go up against them all the time so I'm sure we'll be seeing a lot of CVs come in over the next few days."
机译:竞争对手承包商表示,他们预计本周该公司在未来几天内看到吉尔工作人员的CVS洪水,表示已在剧烈的成本削减方案中摆脱了1,200人。新任首席执行官安德鲁戴维斯在本月底之前,他说650名员工将消失650名员工。一位竞争对手一级行政长官说:“可能是必要的,但它是它发送的消息。通过这种速度,每个人都会感到危险。我们一直对着他们来说,所以我相信我们会看到我们会看到在接下来的几天里,很多CV都会进入。“

著录项

  • 来源
    《Building》 |2019年第24期|9-9|共1页
  • 作者

    Dave Rogers;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 22:31:19

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号