首页> 外文期刊>Building >Project lead admits he had never worked with ACM cladding
【24h】

Project lead admits he had never worked with ACM cladding

机译:项目负责人承认他从未使用过ACM覆层

获取原文
获取原文并翻译 | 示例
       

摘要

Studio E's project lead for the design phase of the Grenfell Tower refurbishment had no professional experience of working with the type of cladding eventually fitted to the tower, the inquiry was told this week, writes Jim Dunton. Associate Bruce Sounes told Martin Moore-Bick's panel his only encounter with aluminium composite material cladding (ACM) had been as a student.
机译:询问本周告诉吉姆·邓顿(Jim Dunton),Studio E在Grenfell塔翻新设计阶段的项目负责人没有使用最终安装在塔上的覆层类型的专业经验。布鲁斯·苏尼斯(Bruce Sounes)的助理告诉马丁·摩尔·比克(Martin Moore-Bick)的小组,他与铝复合材料覆层(ACM)的唯一接触是在学生时代。

著录项

  • 来源
    《Building》 |2020年第9期|15-15|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 05:19:51

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号