首页> 外文期刊>Building >A STUDY IN DISCIPLINE
【24h】

A STUDY IN DISCIPLINE

机译:学科研究

获取原文
获取原文并翻译 | 示例
       

摘要

Low-energy, sustainable public buildings are not a novel concept for the London borough of Sutton. The council built the iconic BedZed eco-village in 2002. A Passivhaus Plus primary school, which generates more energy than it uses, has just been completed in Hackbridge. And the novelty has not worn off: Sutton has now added the UK's largest Passivhaus school - also the first Passivhaus secondary school - to its portfolio. The Harris Academy Sutton, which opened in September this year, is the first building to be completed in the London Cancer Hub masterplan for the 4.8ha former Sutton hospital site. Sutton's senior project manager Adam Whiteley says the council was keen to set the bar high for subsequent projects in terms of sustainability.
机译:对于伦敦萨顿市而言,低能耗,可持续的公共建筑并不是一个新颖的概念。该委员会于2002年建造了标志性的BedZed生态村。一台Passivhaus Plus小学所产生的能源多于所用的能源,刚刚在Hackbridge建成。而且新颖性还没有消失:萨顿现在将英国最大的Passivhaus学校(也是第一所Passivhaus中学)添加到其产品组合中。哈里斯·萨顿哈里斯学院(Harris Academy Sutton)于今年9月开业,是伦敦癌症中心总体规划中4.8公顷原萨顿医院所在地的第一座建筑。萨顿(Sutton)的高级项目经理亚当·怀特利(Adam Whiteley)说,该理事会渴望在可持续性方面为随后的项目设定更高的标准。

著录项

  • 来源
    《Building》 |2019年第48期|32-35|共4页
  • 作者

    Helena Russell;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:44:03

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号