首页> 外文期刊>Building >HOWTO DIG YOURSELF OUT OF A HOLE
【24h】

HOWTO DIG YOURSELF OUT OF A HOLE

机译:如何挖掘自己

获取原文
获取原文并翻译 | 示例
           

摘要

Key risks in construction contracts are being closely examined as a result of the ongoing Brexit uncertainty so that they can be effectively managed and priced accurately to ensure the commercial viability of projects. One of these is the risk of encountering unforeseen ground conditions. Standard forms differ greatly in their approach to allocating this risk, including one that does not expressly deal with it at all. A number have also released new editions of their design and build contracts over the past couple of years, and with construction activity falling last month and insolvencies on the rise across the industry, it is a good time to take stock so that the legal consequences of this risk (at least) are foreseeable.
机译:由于英国退欧的持续不确定性,施工合同中的主要风险正在得到仔细检查,以便可以对其进行有效管理和准确定价,以确保项目的商业可行性。其中之一是遇到不可预见的地面条件的风险。标准形式在分配此风险的方法上有很大不同,包括完全没有明确处理风险的形式。在过去的几年中,许多公司还发布了他们的设计和建造合同的新版本,并且随着上个月建筑活动的减少和整个行业破产的增加,现在是评估库存的良好时机,以便这种风险(至少)是可以预见的。

著录项

  • 来源
    《Building》 |2019年第9期|42-43|共2页
  • 作者

    Ryan Fordham;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号