Trailblazer: The Empire State Building

机译:开拓者:帝国大厦

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This project demonstrates why digital, BIM and automation of construction are not the answer to the core problem. There was no IT when it was delivered, but it took only 410 days to build, and was completed less than two years after the architect was appointed. By comparison, the 2013 One World Trade Center was finished 11 years after the first architect was appointed and took over 3,000 days to build. I am not anti-BIM. Most of the proposed steps to improve project performance will make some difference. However, until the industry addresses the core systemic problems of how project teams are set up and managed, then trying to make major improvements using BIM, offsite manufacture or connected technology will make only marginal improvement.
机译:该项目说明了为什么数字,BIM和建筑自动化不能解决核心问题。交付时没有IT,但仅用了410天的时间就完成了建造,并在任命建筑师后不到两年的时间内完成了建设。相比之下,2013年的世界贸易中心一号楼在任命第一位建筑师11年后竣工,耗时3,000天。我不是反对BIM。建议的大多数提高项目绩效的步骤都会有所不同。但是,直到该行业解决了如何建立和管理项目团队的核心系统性问题,然后尝试使用BIM,异地制造或关联技术进行重大改进将只能带来很小的改进。

著录项

  • 来源
    《Building》 |2018年第14期|27-27|共1页
  • 作者

    lan Heptinstall;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号