首页> 外文期刊>Building >READY FOR THE OFF?
【24h】

READY FOR THE OFF?

机译:准备好了吗?

获取原文
获取原文并翻译 | 示例
       

摘要

An ongoing skills crisis, an uncertain political and economic environment and some of the slimmest margins on record. These are the big factors influencing the financial operation of contractors this year and in turn the financial futures of those they employ. Earlier this year Building's latest Top 150 contractors and housebuilders survey revealed that average margins across the top 10 contractors had been squeezed to just 0.38%. Unsurprisingly, with contractors feeling the crunch, wage growth for contracting professionals has remained more or less flat, albeit still outstripping the national average. The precarious position of contractors was perhaps best highlighted at the very start of this year when it all came undone for construction behemoth Carillion, which went crashing out of existence in spectacular fashion.
机译:持续的技能危机,不确定的政治和经济环境以及有记录的最低利润。这些是影响承包商今年财务运作的主要因素,进而影响他们雇用的承包商的财务前景。今年早些时候,Building最新的前150名承包商和房屋建筑商调查显示,前10名承包商的平均利润率仅压缩至0.38%。毫不奇怪,随着承包商感到紧缩,承包专业人士的工资增速基本保持不变,尽管仍超过了全国平均水平。承包商的pre可危地位也许在今年年初得到了最好的体现,当时建筑巨兽Carillion的一切都被撤消了,后者以惊人的方式崩溃了。

著录项

  • 来源
    《Building》 |2018年第46期|24-27|共4页
  • 作者

    Jordan Marshall;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:01:24

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号