首页> 外文期刊>Building Services Engineering Research & Technology >Energy audit and air-conditioning system renovation analysis on office buildings using air-source heat pump in Shanghai
【24h】

Energy audit and air-conditioning system renovation analysis on office buildings using air-source heat pump in Shanghai

机译:上海市空气源热泵办公楼能源审计与空调系统改造分析

获取原文
获取原文并翻译 | 示例
       

摘要

In the past, the building energy consumption was surveyed without distinction of air-conditioning system types, which caused large dispersal of the energy consumption of the same building type. To study energy consumption of office buildings using air-source heat pump, six office buildings using air-source heat pump in Shanghai were investigated through energy audit and field test. The energy use intensity (EUI) per annum ranged from 102 to 139kWh/m~2, with an average value of 126kWh/m~2. The EUI range of office buildings using air-source heat pump is much smaller than the EUI of office buildings according to the literature. Based on field test of the air-conditioning (A/C) system, it was found that the present main problem of A/C system included insufficient refrigeration capacity of A/C system, low A/C system energy efficiency, and small cold water temperature difference. Countermeasures were brought forward to solve the problems, including ① retrofitting part of the present air-source heat pumps to water-cooled cold water air-conditioners, ② retrofitting present air-source heat pumps into new air-source heat pumps, and ③ pump variable frequency renovation. The A/C load is estimated by Bin method. According to the case study in this paper, the pay back period are about two years for the first measure, five to seven years for the second measure, and 0.65-2 years for the third measure. Practical application: Generally, the energy consumption survey gives a wide range of data. To some extent, it is caused by the survey method which does not take the air-conditioning type into consideration. The work stresses on the energy consumption of office buildings using air-source heat pump. The result showed that the energy consumption was in a relatively small range, which will be more meaningful to industry. Energy saving measures concerning air-conditioning system is studied on the basis of the survey.
机译:过去,对建筑物的能耗进行了调查,没有区分空调系统的类型,这导致了同一建筑物类型的能耗的大量分散。为了研究使用空气源热泵的办公楼的能耗,通过能源审计和现场测试对上海的六座使用空气源热泵的办公楼进行了调查。每年的能源使用强度(EUI)为102至139kWh / m〜2,平均值为126kWh / m〜2。根据文献,使用空气源热泵的办公楼的EUI范围比办公楼的EUI小得多。根据空调系统的现场测试,发现当前空调系统的主要问题包括空调系统制冷能力不足,空调系统能效低,制冷量小。水温差。提出了解决问题的对策,包括:①将本气源热泵的一部分改造为水冷冷水空调器;②将本气源热泵改造为新的气源热泵;③泵。变频改造。 A / C负载通过Bin方法估算。根据本文的案例研究,第一项措施的投资回收期约为两年,第二项措施的投资回收期约为5至7年,第三项措施的投资回收期约为0.65-2年。实际应用:能耗调查通常会提供广泛的数据。在某种程度上,这是由不考虑空调类型的调查方法引起的。工作重点是使用空气源热泵的办公楼能耗。结果表明,能耗在一个相对较小的范围内,这对工业将具有更大的意义。在调查的基础上,研究了空调系统的节能措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号