【24h】

New projects portfolio

机译:新项目组合

获取原文
获取原文并翻译 | 示例
           

摘要

Nearly 15 years in the making, the Clark Art Institute in Williamstown, Mass., opened its expanded, 140-acre campus following a multi-phased construction and renovation effort that added more than 13,000 sf of gallery space to the campus. Tadao Ando's new, 42,600-sf Clark Center building includes gallery space for special exhibitions; a multipurpose pavilion; dining, retail, and family spaces; and an all-glass pavilion that serves as the new entrance to the original Museum Building. Selldorf Architects led the renovation of the existing Museum Building and Manton Research Center. The three buildings surround a new one-acre reflecting pool. Gensler was the executive architect and sustainability consultant for the project.
机译:经过近15年的发展,位于马萨诸塞州威廉斯敦的克拉克艺术学院经过多阶段的建设和翻新工作,在校园中扩建了超过13,000平方英尺的画廊,随后扩建了140英亩的校园。安藤忠雄(Tadao Ando)的新的42,600平方英尺的克拉克中心大楼(Clark Center)包括特别展览的画廊空间;多功能凉亭;餐饮,零售和家庭场所;还有一个全玻璃凉亭,是原始博物馆大楼的新入口。 Selldorf Architects领导了对现有博物馆大楼和Manton研究中心的翻新工程。这三座建筑环绕着一个新的一英亩的倒影池。 Gensler是该项目的执行架构师和可持续性顾问。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号