首页> 外文期刊>Broadcasting & Cable >Top Engineers' Hope: If We Build It, They Will Come
【24h】

Top Engineers' Hope: If We Build It, They Will Come

机译:顶级工程师的希望:如果我们建造它,他们会来的

获取原文
获取原文并翻译 | 示例
       

摘要

The top technology and engineering executives at the four English-language network owned-and-operated TV station groups recently sat down with B&C contributing editor George Winslow to discuss their technology priorities. Here are some of the highlights. Repurposing content for multiple platforms and finding ways to make their operations more efficient remains top of mind with ABC's engineers, says Dave Converse, VP of engineering at the ABC Owned Television Stations. As part of those efforts, ABC has centralized its ingest operations, expanded its file-based workflows and deployed tools to streamline the delivery of video back from the field. Much of the group's capital budget, however, is devoted to replacing and upgrading existing equipment, Converse says.
机译:四个英语网络拥有和运营的电视台组织的最高技术和工程管理人员最近与B&C特约编辑George Winslow坐下来讨论了他们的技术重点。这儿是一些精彩片段。 ABC拥有电视台的工程副总裁Dave Converse说,重新利用多个平台的内容并找到提高运营效率的方法仍然是ABC工程师的首要任务。作为这些工作的一部分,ABC集中了其提取操作,扩展了其基于文件的工作流,并部署了一些工具以简化从现场返回视频的过程。 Converse说,该集团的大部分资本预算都用于更换和升级现有设备。

著录项

  • 来源
    《Broadcasting & Cable》 |2013年第30期|17-17|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:17:06

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号