...
首页> 外文期刊>Bridge structures >Construction stages of cable-stayed bridges with composite deck
【24h】

Construction stages of cable-stayed bridges with composite deck

机译:复合桥面斜拉桥的施工阶段

获取原文
获取原文并翻译 | 示例
           

摘要

A cable-stayed bridge is built by following a construction sequence of different subsequent stages that imply changes of the geometric configuration, restraints and consequently stress and strain patterns. A study is presented about stay stressing sequences in cable-stayed bridges with composite deck for the case of construction made by the cantilever method. Initial cable forces are found through partial elastic schemes of construction stages. Different stay stressing procedures are implemented and a comparison between them is proposed in order to evaluate the differences in terms of deformed shape and internal force distribution of the deck and the pylon. Results can be useful to give practical suggestions to designers, when they have to deal with stay stressing sequences of composite cable-stayed bridges.
机译:斜拉桥是按照不同后续阶段的施工顺序建造的,这暗示着几何构型,约束以及应力和应变模式的变化。对于悬臂法施工的斜拉桥复合桥面的拉应力顺序研究。初始缆索力通过施工阶段的局部弹性方案找到。实施了不同的拉应力程序,并进行了比较,以评估甲板和吊索的变形形状和内力分布方面的差异。当设计人员必须处理复合斜拉桥的拉应力顺序时,结果可为他们提供实用的建议。

著录项

  • 来源
    《Bridge structures》 |2012年第4期|93-106|共14页
  • 作者单位

    Dipartimento di Ingegneria Civile, Ambientale, Aerospatiale e dei Materiali, Universita di Palermo, Palermo, Italy;

    Dipartimento di Ingegneria Civile, Ambientale, Aerospatiale e dei Materiali, Universita di Palermo, Palermo, Italy;

    Dipartimento di Ingegneria Civile, Ambientale, Aerospatiale e dei Materiali, Universita di Palermo, Palermo, Italy;

    Dipartimento di Ingegneria Civile, Universita di Messina, Messina, Italy;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    cable-stayed bridge; composite section; stays; stressing sequence; pretension;

    机译:斜拉桥;复合部分停留;强调顺序;预张力;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号