【24h】

FORTH FIELD

机译:第四场

获取原文
获取原文并翻译 | 示例
       

摘要

About 30km upstream of the busy Forth Road Bridge in Scotland, the Kincardine Bridge also struggles with rising congestion. But relief is already on the way for this ageing road bridge, and motorists on the old bridge can now see the leading edge of the incrementally-launched deck creeping slowly out across the estuary. The design and build contract is being carried out by Morgan Vinci, a joint venture of Morgan Est and Vinci Construction Grands Projets with consultant Benaim responsible for the detailed bridge design.
机译:Kincardine桥在苏格兰繁忙的Forth Road桥上游约30公里处,还因交通拥堵而挣扎。但是,对于这座老化的公路桥梁来说,救济已经在路上,而在旧桥上的驾驶者现在可以看到,逐渐增高的桥面的前缘缓缓地越过河口。由Morgan Est和Vinci Construction Grands Projets组成的合资企业Morgan Vinci和顾问Benaim负责详细的桥梁设计,该设计和建造合同由该公司负责。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号