首页> 外文期刊>The bottom line >Controlling superprojects - information management requirements
【24h】

Controlling superprojects - information management requirements

机译:控制SuperProjects - 信息管理要求

获取原文
获取原文并翻译 | 示例
       

摘要

Purpose - This papa- aims to explore the problems of managing superprojects and identifies how a different approach to controlling them can reduce the incidence of cost and time overruns and benefit shortfalls. Design/methodology/approach - Literature review accompanied by conceptual analysis. Findings - Project cost and timing overruns and benefit shortfalls are very frequent in superprojects. These problems can be ascribed partly to the way in which they are planned is not taken into account in designing and implementing control systems, particularly the governance processes and the information they have available. Practical implications - This paper has serious implications for those designing control processes, governance and information management for superprojects. It suggests that if a new approach is taken, fewer superprojects will suffer from cost overruns and benefit shortfalls because remedial actions will be taken earlier for projects, which are experiencing problems, while learning will be fed back to those planning new projects. Social implications - There will be saving of public money and reduced deferment of benefits that normally result from failed or delayed projects and reduced allocation of large incremental budgets dedicated to resolving problems. Originality/value - The taxonomy of different types of superprojects is original, as is the idea of ambidextrous control, and the diagnosis of failure reasons lying in the nature of control and governance processes, and the lack of relevant information available during the control process.
机译:目的 - 这拍拍者旨在探讨管理超级项目的问题,并确定控制它们的不同方法如何降低成本和时间过度的发病率和利益缺失。设计/方法/方法 - 文学评论伴随着概念分析。调查结果 - 项目成本和时序超支和福利短缺在超级项目中非常频繁。这些问题可以部分地归因于在设计和实施控制系统时未考虑他们计划的方式,特别是治理过程以及他们所提供的信息。实际意义 - 本文对SuperProjects的设计控制流程,治理和信息管理具有严重影响。它表明,如果采取了一种新的方法,更少的超级项目将遭受成本超支和福利缺陷,因为将提前采取补救措施,这些项目正在遇到问题,而学习将被送回那些规划新项目。社会影响 - 将节省公共资金,并减少通常导致失败或延迟项目的福利延期,并减少致力于解决问题的大型增量预算的分配。原创性/价值 - 不同类型的超级项目的分类是原创的,也是双向控制的想法,以及对控制和治理过程的性质的故障原因的诊断,以及在控制过程中缺乏相关信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号