首页> 外文期刊>Automation in construction >Assessing the impact of materials tracking technologies on construction craft productivity
【24h】

Assessing the impact of materials tracking technologies on construction craft productivity

机译:评估材料跟踪技术对施工工艺生产率的影响

获取原文
获取原文并翻译 | 示例
           

摘要

Even though previous studies indicate that construction labor productivity can benefit from automated tracking technologies for field materials management purposes, the actual impact of these technologies on construction productivity has not been fully investigated. This study attempted to quantify the productivity impact of automating the identification and localization of engineered components on industrial sites. For this purpose, an extensive field trial was conducted on a power-plant project. Data from both a traditional tracking process and an automated tracking process designed for the purposes of this study were collected. By considering the traditional tracking process as the baseline for comparison, this study quantified and assessed the impact of the automated tracking methodology. The results indicate that materials tracking technologies can significantly improve craft labor productivity.
机译:尽管先前的研究表明,用于现场物料管理的自动跟踪技术可以使建筑工人的生产率受益,但尚未充分研究这些技术对建筑生产率的实际影响。这项研究试图量化在工业现场对工程组件进行自动识别和本地化对生产率的影响。为此,对一个电厂项目进行了广泛的现场试验。从传统的跟踪过程和为此研究目的设计的自动跟踪过程中收集了数据。通过将传统的跟踪过程作为比较的基准,本研究量化并评估了自动跟踪方法的影响。结果表明,材料跟踪技术可以显着提高工艺劳动生产率。

著录项

  • 来源
    《Automation in construction》 |2009年第7期|903-911|共9页
  • 作者单位

    Department of Civil Construction, and Environmental Engineering, The University of Alabama, Box 870205, Tuscaloosa, AL 35487-0205, United States;

    Department of Civil, Architectural, and Environmental Engineering, The University of Texas at Austin, 1 University Station C1752, Austin, TX 78712-0273, United States;

    Department of Civil Engineering, University of Waterloo, 200 University Avenue West, Waterloo, Ontario, Canada N2L 3G1;

    Department of Civil Engineering, 151C Raymond Building, University of Kentucky, Lexington, KY 40506-0281, United States;

    Department of Civil, Architectural, and Environmental Engineering, The University of Texas at Austin, 1 University Station C1752, Austin, TX 78712-0273, United States;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    materials tracking; productivity; construction automation;

    机译:物料跟踪;生产率;建筑自动化;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号