首页> 外文期刊>Automation in construction >Identifying and assessing critical risk factors for BIM projects: Empirical study
【24h】

Identifying and assessing critical risk factors for BIM projects: Empirical study

机译:识别和评估BIM项目的关键风险因素:实证研究

获取原文
获取原文并翻译 | 示例
           

摘要

Building information modelling (BIM) technology exhibits strong potential to become the core technology used in the construction industry. However, the process of implementing new technology involves numerous challenges, and the performance of new technology can be impaired when unidentified risk factors are present during implementation. A complete understanding of the risk factors can enable BIM users to execute early responses to the potential risks, thus increasing the possibility that BIM is implemented successfully. In this study, 13 risk factors related to the technical, management, personnel, financial, and legal aspects of BIM adoption were identified. Based on the results of a questionnaire survey distributed to architects, engineering consultants, academics, and construction companies in the architecture, engineering, and construction industry in Taiwan, relationships between risk factors were identified using the decision-making trial and evaluation laboratory method. This study identified the critical risk factors of BIM projects at various levels and proposes relative risk-response strategies for a case study project.
机译:建筑信息模型(BIM)技术具有成为建筑行业中使用的核心技术的强大潜力。但是,实施新技术的过程涉及许多挑战,如果在实施过程中存在不确定的风险因素,则会损害新技术的性能。完全了解风险因素可以使BIM用户能够对潜在风险进行早期响应,从而增加BIM成功实施的可能性。在这项研究中,确定了与采用BIM的技术,管理,人员,财务和法律方面有关的13个风险因素。根据分发给台湾建筑,工程和建筑行业的建筑师,工程顾问,学者和建筑公司的问卷调查结果,使用决策试验和评估实验室方法确定了风险因素之间的关系。这项研究确定了BIM项目各个级别的关键风险因素,并为案例研究项目提出了相对的风险应对策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号