PARTICULARS OF RISK DETERMINATION FOR INVESTMENTS IN NPP CONSTRUCTION PROJECTS

机译:核电厂建设项目投资风险的具体确定

获取原文
获取原文并翻译 | 示例
       

摘要

An important element in making decisions about choosing a preferred NPP project is the evaluation of the economic risk associated with macroeconomic uncertainty. Different parameters can be used to classify the risks that must be taken into account when calculating the efficacy of building a NPP. They must be viewed as the quintessence of the general, investment, and project risks considered in conventional power generation projects as well as specialized risks inherent in nuclear power. A method of cumulative quantitative determination of the risks of such projects based on global experience is presented here. It can improve the existing approaches to the calculation of the main economic indices of NPP construction projects.
机译:做出有关选择优先核电厂项目的决定的重要因素是评估与宏观经济不确定性相关的经济风险。在计算建设核电厂的效力时,可以使用不同的参数对必须考虑的风险进行分类。必须将它们视为常规发电项目中考虑的一般风险,投资风险和项目风险的精髓,以及核电固有的专门风险。本文介绍了一种基于全球经验的累积定量确定此类项目风险的方法。它可以改进现有的核电厂建设项目主要经济指标的计算方法。

著录项

  • 来源
    《Atomic Energy》 |2014年第3期|207-213|共7页
  • 作者

    M. V. Koptelov; A. I. Guseva;

  • 作者单位

    National Nuclear Research University - Moscow Engineering-Physics Institute (NIYaU MIFI), Moscow;

    National Nuclear Research University - Moscow Engineering-Physics Institute (NIYaU MIFI), Moscow;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:39:18

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号