首页> 外文期刊>ASHRAE Transactions >Deep Energy Retrofit of Presidio Army Barracks
【24h】

Deep Energy Retrofit of Presidio Army Barracks

机译:Presidio军营的深层能源改造

获取原文
获取原文并翻译 | 示例
       

摘要

Presidio of Monterey, home to the Defense Language Institute, faces the same challenges as other Army bases in managing its aging building stock. More than 25% of the barracks, for example, were built in the 1960s and lack today's safety, comfort, and energy-efficiency standards. In preparing to address the shortfalls of one such Presidio barracks, Building 630, the Directorate of Public Works staff worked with the U.S. Army Corps of Engineers to chart a path forward. Rather than relying on conventional approaches to infrastructure modernization, stakeholders decided to craft the military's first documented deep energy retrofit (DER) solution. The Army defines a DER as "a major building renovation project in which site energy use intensity (includingplug loads) has been reduced by at least 50%from the pre-renovation baseline with a corresponding improvement in indoor environmental quality and comfort "(Zhivov et al. 2016). For Presidio, preliminary energy modeling helped set an ambitious but achievable goal of 86% energy savings using a combination of high performance envelope requirements with super-efficient (but commercially available) FTVAC and lighting systems including solar hot-water generation sized for 70% of the domestic load. Ultimately, Presidio will apply the successes and lessons learned of its first DER towards additional retrofit projects to better align with its mandated net zero energy trajectory. The true value, however, lies in leveraging energy savings as a part of renovation projects aimed at raising the quality of facility conditions to a level commensurate with the mission of its occupants. The goal of this paper is to demonstrate the acquisition strategies employed and field lessons learned in an attempt to better guide prospective DER project stakeholders. Being a federal facility, this project employed a regimented process to its various contracting phases with some strategic augmentation to support the DER method that is transferable to similar retrofit efforts. As a pilot effort, there have also been many process-based and technical lessons learned that can be used to bolster future DER work at Presidio, in the Army, and throughout the sustainability industry.
机译:国防语言学院的所在地蒙特雷的普雷西迪奥(Presidio)在管理老化的建筑存货方面面临着与其他陆军基地相同的挑战。例如,超过25%的军营建于1960年代,缺乏当今的安全性,舒适性和能效标准。在准备解决这样一个Presidio军营630号楼的不足时,公共工程局工作人员与美国陆军工程兵团一起努力,指明了前进的道路。利益相关者不再依赖传统的基础设施现代化方法,而是决定设计军方第一个有据可查的深度能源改造(DER)解决方案。陆军将DER定义为“一项重大的建筑翻新项目,其现场能源使用强度(包括插头负荷)比翻新前的基准降低了至少50%,室内环境质量和舒适度得到了相应的改善”(Zhivov等等(2016年)。对于Presidio,初步的能源建模通过将高性能封套要求与超高效(但市售)的FTVAC和照明系统(包括可用于70%的太阳能热水的系统)相结合,帮助设定了一个雄心勃勃但可实现的目标,即实现86%的能源节省。国内负荷。最终,Presidio将把其首个DER的成功经验和教训应用于其他改造项目,以更好地与其规定的净零能耗轨迹保持一致。然而,真正的价值在于利用节能作为翻新项目的一部分,旨在将设施条件的质量提高到与乘员的任务相称的水平。本文的目的是演示所采用的采购策略和现场经验教训,以期更好地指导潜在的DER项目利益相关者。作为联邦机构,该项目在各个合同阶段采用了严格的流程,并进行了一些战略性扩展,以支持可转换为类似改造工作的DER方法。作为试点工作,还获得了许多基于过程和技术的经验教训,可用于支持Presidio,陆军和整个可持续发展行业的未来DER工作。

著录项

  • 来源
    《ASHRAE Transactions》 |2017年第2017期|39-54|共16页
  • 作者单位

    U.S. Army Garrison Presidio of Monte rey, CA;

    Construction Engineering Research Laboratory (ERDC-CERL), Champaign, IL;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:41:39

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号