The Bank of America building in New York was designed to earn LEED Platinum certification. As such, the A/V designs from CMS Audiovisual Consultants had to be as green as possible. The project spanned 38 floors, 50 presentation rooms, 63 videoconferencing rooms, three trading floors, and more. CMS built environmental controls for shades and lighting into the control systems and designed programmable timing systems for shutting down videowalls, projectors, and widespread displays.
展开▼