首页> 外文期刊>Architectural Design >Ever Faster But Still Very Good
【24h】

Ever Faster But Still Very Good

机译:更快但仍然非常好

获取原文
获取原文并翻译 | 示例
       

摘要

The realities of today's economics, coupled with the possibilities now inherent in the latest design and construction technologies, have created a 'speed to construction' movement in architecture. This is not to say that the goal of building owners is to reduce the time the design takes, but rather that the start of construction has become a widely sought-after project milestone. As many owners look to reduce the overall duration of building projects, it has become increasingly prevalent for design time to be overlapped or integrated with construction time. When properly orchestrated, the integration of these phases can enhance both the design and the project as a whole, which becomes greater than the sum of its parts: a 1 + 1 = 3 model.
机译:当今经济的现实状况,再加上最新设计和建筑技术所固有的可能性,已经在建筑界掀起了一场“从建造到建造”的运动。这并不是说建筑所有者的目标是减少设计时间,而是开始建造已经成为广受欢迎的项目里程碑。由于许多业主希望减少建筑项目的总体工期,因此设计时间与建筑时间重叠或整合变得越来越普遍。如果精心安排,这些阶段的集成可以增强设计和整个项目,这将大于其各个部分的总和:1 +1 = 3模型。

著录项

  • 来源
    《Architectural Design》 |2016年第1期|114-119|共6页
  • 作者

    Jonathan Mallie;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:26:36

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号