Lately numerous ground treatments are being embraced as the structural approach to regulate the total settlement and differential settlement which is the root of the undulating road problem. A piled embankment is commonly adopted to control the total and differential settlements. While a vertical drain with a surcharge is applied to expedite settlement and transition piles are used to regulate differential settlement, embankment stability is a major drawback for this approach. Therefore, a common industry practice is that both ground treatments are applied to optimize the design and construction. The main concern is the differential settlement at the intersection of these treatments during the post-construction period. A transition piled embankment at the vertical drain with surcharge may resolve this drawback, but long-term settlement must be considered in the design to ensure that the post-ground treatment settlement and differential settlement are kept within the design requirements. This paper proposes the transition piled embankment with a surcharged prefabricated vertical drain. The performance in terms of settlement, cost and time is assessed to establish the effectiveness of the proposed system, which is validated by performing a full-scale field test. By introducing the intersection ground treatment, post-construction settlement and differential settlement are regulated significantly. The cost and time required for the transition piled embankment with surcharged prefabricated vertical drain are also insignificant as compared to conventional ground treatment approaches.
机译:最近,许多地面处理方法被用作调节总沉降和不均匀沉降的结构方法,这是起伏的道路问题的根源。通常采用堆积路堤来控制总沉降量和差异沉降量。尽管采用带附加费的垂直排水装置来加快沉降,并使用过渡桩来调节差异沉降,但路堤的稳定性是该方法的主要缺点。因此,一种常见的行业惯例是两种地面处理均被用来优化设计和施工。主要问题是在施工后这些处理相交处的差异沉降。在垂直排水沟处有附加费的过渡堆积路堤可以解决此缺点,但是在设计中必须考虑长期沉降,以确保将地面处理后沉降和不均匀沉降保持在设计要求之内。本文提出了一个过渡堆桩路堤,并附有预制的垂直排水沟。评估结算,成本和时间方面的性能以建立所提出系统的有效性,并通过进行全面的现场测试进行验证。通过引入交叉路口地面处理,可以对施工后沉降和差异沉降进行显着调节。与传统的地面处理方法相比,带有超载预制垂直排水管的过渡堆积路堤所需的成本和时间也微不足道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号