首页> 外文期刊>Applied Mathematical Modelling >Fuzzy project scheduling problem and its hybrid intelligent algorithm
【24h】

Fuzzy project scheduling problem and its hybrid intelligent algorithm

机译:模糊项目调度问题及其混合智能算法

获取原文
获取原文并翻译 | 示例

摘要

Project scheduling problem is to determine the schedule of allocating resources so as to balance the total cost and the completion time. This paper considers a type of project scheduling problem with fuzzy activity duration times. According to some management goals, three types of fuzzy models are built to solve the project scheduling problem. Moreover, the technique of fuzzy simulation and genetic algorithm are integrated to design a hybrid intelligent algorithm to solve the fuzzy models. Finally, some numerical examples are given to illustrate the effectiveness of the algorithm.
机译:项目调度的问题是确定资源分配的时间表,以平衡总成本和完成时间。本文考虑一类具有模糊活动持续时间的项目调度问题。根据一些管理目标,建立了三种类型的模糊模型来解决项目调度问题。此外,将模糊仿真技术与遗传算法相结合,设计了一种混合智能算法来求解模糊模型。最后,通过数值例子说明了算法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号