首页> 外文期刊>Applied Energy >Transient thermo-mechanical analysis of steam generators for solar tower plants
【24h】

Transient thermo-mechanical analysis of steam generators for solar tower plants

机译:太阳能塔式设备蒸汽发生器的瞬态热力学分析

获取原文
获取原文并翻译 | 示例
       

摘要

In solar power tower plants, fast start-ups and/or load changes are mandatory to increase the power plant dispatchability. The high temperatures of the working fluids and the partial-load operation will reduce the lifetime of the thick-walled components at the steam generator. Therefore, a proper heat exchanger design should consider the stress evolution during the transient operation of the plant.
机译:在太阳能塔式电厂中,必须快速启动和/或更改负载以提高电厂的可调度性。工作流体的高温和部分负荷运行将缩短蒸汽发生器处厚壁组件的使用寿命。因此,正确的换热器设计应考虑设备瞬态运行期间的应力变化。

著录项

  • 来源
    《Applied Energy》 |2018年第15期|1051-1068|共18页
  • 作者单位

    Univ Carlos III Madrid, Dept Thermal & Fluid Engn, Campus Leganes, Madrid 28911, Spain;

    Univ Carlos III Madrid, Dept Thermal & Fluid Engn, Campus Leganes, Madrid 28911, Spain;

    Univ Carlos III Madrid, Dept Thermal & Fluid Engn, Campus Leganes, Madrid 28911, Spain;

    Univ Carlos III Madrid, Dept Thermal & Fluid Engn, Campus Leganes, Madrid 28911, Spain;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Solar power tower plant; Steam generator; Start-up procedures; Thermal stress analysis;

    机译:太阳能塔厂;蒸汽发生器;启动程序;热应力分析;
  • 入库时间 2022-08-18 00:07:25

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号