首页> 外文期刊>APICS >The Changing Role of the Master Scheduler
【24h】

The Changing Role of the Master Scheduler

机译:主计划程序的角色变化

获取原文
获取原文并翻译 | 示例
       

摘要

Although the output of the scheduling process remains intact, how the master scheduler develops that output has changed considerably. For decades, the master scheduler integrated the numerous requirements of the production line with little input from the non-production aspects of the supply chain. Today's master scheduler must possess a different set of skills than his or her predecessor-those of a communicator, a consensus builder, a problem solver, a teacher, a technologist, a negotiator, and a master of change. Little of the clerical nature of the job remains. To continue to add value, the master scheduler needs to adapt quickly to these changes and possess creative problem-solving skills.
机译:尽管调度过程的输出保持不变,但是主调度程序如何开发该输出已发生了很大变化。几十年来,主调度程序整合了生产线的众多需求,而很少有供应链非生产方面的投入。今天的主计划程序必须具有与他或她的前任不同的技能集,即沟通者,共识建立者,问题解决者,老师,技术人员,谈判者和变革大师。这项工作的文书性质几乎没有。为了继续增加价值,主计划程序需要快速适应这些变化并拥有创造性的解决问题的能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号