首页> 外文期刊>APICS >Double-Click to Schedule
【24h】

Double-Click to Schedule

机译:双击预定

获取原文
获取原文并翻译 | 示例
           

摘要

Schedulers have been a part of enterprise resources planning (ERP) and manufacturing resource planning (MRP II) software systems for many years. Recently, new technology is offering increasingly sophisticated systems that apply advanced logic to the scheduling process. However, many companies still find their systems are unable to come up with a schedule that maximizes use and efficiency while ensuring that all work is completed on time. The traditional ERP or MRP II planning processes used bills of material, inventory, and due dates from the master schedule to lay out a production plan. It then was the job scheduler's role to add the operations dates at work centers using an approach called infinite-capacity logic, also known as infinite-loading logic. These terms refer to a model for required capacity that is calculated without regard for actual capacity available to perform the work. Through capacity requirements planning, the load-versus-capacity profile for each work center was generated, enabling operations managers to anticipate and hopefully resolve any mismatches before they caused problems.
机译:调度程序已经成为企业资源计划(ERP)和制造资源计划(MRP II)软件系统的一部分。最近,新技术提供了越来越复杂的系统,这些系统将高级逻辑应用于调度过程。但是,许多公司仍然发现他们的系统无法制定出时间表,以最大化使用率和效率,同时确保所有工作都按时完成。传统的ERP或MRP II计划流程使用物料清单,库存和主计划中的到期日期来制定生产计划。然后,作业调度程序的角色是使用称为无限容量逻辑(也称为无限加载逻辑)的方法在工作中心添加操作日期。这些术语指的是所需容量的模型,该模型是在不考虑可用于执行工作的实际容量的情况下计算的。通过容量需求计划,生成了每个工作中心的负载-容量-配置文件,使运营经理可以预测并希望在出现问题之前解决任何不匹配问题。

著录项

  • 来源
    《APICS》 |2013年第2期|18-18|共1页
  • 作者

    Dave Turbide;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号