首页> 外文期刊>Annals of nuclear energy >Transient performance of air-cooled condensing heat exchanger in long-term passive cooling system under decay heat load
【24h】

Transient performance of air-cooled condensing heat exchanger in long-term passive cooling system under decay heat load

机译:衰减热负荷下长期被动冷却系统中风冷式冷凝器的瞬态性能

获取原文
获取原文并翻译 | 示例
           

摘要

The transient performance of an air-cooled condensing heat exchanger in a long-term passive cooling system was evaluated under a decay heat load modeled by the ANS-73 curve. An experiment was conducted in a 1/2500-volume scaled-down model of the emergency cooldown tank (ECT) of the system integrated modular advanced reactor (SMART). It was confirmed that the scaled design requirement of cooling capacity of the air-cooled condensing heat exchanger was well satisfied under the decay heat load. It was also confirmed that the water level in the emergency cooldown tank was maintained continuously for longer than 72 h by the collection of steam in the air-cooled condensing heat exchanger under the decay heat load. (C) 2017 Elsevier Ltd. All rights reserved.
机译:在由ANS-73曲线建模的衰减热负荷下,评估了长期被动冷却系统中风冷式冷凝热交换器的瞬态性能。在系统集成模块化先进反应堆(SMART)的应急冷却水箱(ECT)的1/2500体积缩小模型中进行了实验。可以确定的是,在衰减热负荷下,风冷冷凝式换热器的冷却能力的缩放设计要求得到了很好的满足。还可以确认,通过在衰减热负荷下,在空冷冷凝式换热器中收集蒸汽,可以将应急冷却罐中的水位连续保持超过72小时。 (C)2017 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号