Final Construction Cost Prediction by Using the Earned Value Index Application Method

机译:利用挣值指数法的最终工程造价预测

获取原文
获取原文并翻译 | 示例
           

摘要

Earned Value (EV) is a project control technique providing a quantitative measure integrating both schedule and cost information. 'The greatest advantage, in applying the concept of EV to projects, is that the construction manager and site manager can statistically predict Estimated at Completion (EAC) in the early construction stage. To predict EAC, Schedule Performance Index (SPI), Cost Performance Index (CPI), and SPI ~★ CPI is used. However, it is not certain which application is suitable for prediction or when EAC is a reliable value for construction managers or site managers.rnTherefore, this study first speculates which index is most suitable for EAC, and what meaning the EAC has compared to the Actual EAC. The second objective is to show the framework when EAC applies to various types of construction projects (e.g. residential, commercial, industrial etc.)
机译:挣值(EV)是一种项目控制技术,可提供结合进度和成本信息的定量度量。 ``将EV概念应用到项目中的最大优势在于,施工经理和现场经理可以在施工初期就统计预测竣工估算(EAC)。要预测EAC,请使用计划绩效指数(SPI),成本绩效指数(CPI)和SPI〜★CPI。但是,尚不确定哪种应用适合预测,或者何时EAC对于施工经理或工地管理者而言是可靠的价值。因此,本研究首先推测了哪个指数最适合EAC,以及EAC与实际相比有什么含义。 EAC。第二个目标是展示EAC适用于各种类型的建筑项目(例如住宅,商业,工业等)的框架。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号