...
首页> 外文期刊>American journal of applied sciences >Occupational Safety and Health in Tunnelling in Rocks Formations Potentially Containing Asbestos: Good Practices for Risk Assessment and Management
【24h】

Occupational Safety and Health in Tunnelling in Rocks Formations Potentially Containing Asbestos: Good Practices for Risk Assessment and Management

机译:可能含有石棉的岩层中隧道掘进的职业安全和健康:风险评估和管理的良好实践

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In tunnelling operations, Occupational Safety and Health (OS&H) and Environmental Protection of the areas close to the tunnel portal become even more critical in case of rock formations potentially containing asbestos, quartz, radioactive elements, etc. In order to limit the workers' exposure and the environmental impact becomes in these cases of paramount importance to preliminarily analyze and quantify the possible presence of the pollutants in the rock and, if necessary, to implement suitable measures to avoid/minimize their emission from the winning and mucking operations. However, in case of asbestos minerals, to obtain reliable results from the preliminary analysis is a challenging task, due to the complex patterns of occurrence of asbestos within the host rock. Consequently, the definition of special monitoring, alarm and control systems is essential during the tunnel excavation. The paper summarizes the results of a thorough study aimed at defining the most suitable monitoring techniques in uncertain situations and the residual criticalities, essentially due to the delay between the beginning of the pollutant release at the tunnel face and its detection. The final part of the work deals with the possible innovative prevention solutions suitable to minimize the previously mentioned delay and ensure the safety of the workers along the time necessary to stop the activities and evacuate the tunnel, on hold of the activation of a special "asbestos" organization.
机译:在隧道作业中,在可能含有石棉,石英,放射性元素等的岩层中,靠近隧道入口的区域的职业安全与健康(OS&H)和环境保护变得尤为重要。为了限制工人的接触在这些情况下,对环境的影响变得极为重要,以便对岩石中污染物的可能存在进行初步分析和量化,并在必要时采取适当措施,避免/最小化中标和填埋作业中的污染物排放。然而,在石棉矿物的情况下,由于基质岩体内石棉的出现方式复杂,要从初步分析中获得可靠的结果是一项艰巨的任务。因此,在隧道开挖期间,定义特殊的监视,警报和控制系统至关重要。本文总结了一项彻底研究的结果,该研究旨在确定不确定情况下最合适的监测技术和残余临界值,这主要是由于隧道面污染物释放开始与检测之间的延迟所致。工作的最后部分是解决可能的创新性预防方案,这些方案可最大程度地减少上述延迟,并在停止活动和撤离隧道所需的时间内确保工人的安全,同时还应启用特殊的“石棉”。 ”组织。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号