【24h】

F-35 Software

机译:F-35软件

获取原文
获取原文并翻译 | 示例
           

摘要

Vice Admiral Mat Winters, the Program Executive Officer for the F-35 Lightning II Joint Program Office (JPO), told a symposium organised by the Defense One website in Washington on September 6 that with the increasing rate of F-35 procurement warfighters are getting what they asked for. He said: "While problems remain, we understand where the deficiencies are and how we go forward." The F-35 JPO is aiming to close a deal for 74 F-35s in Lot 11 before the end of the year, reducing the unit price for the F-35A to less than the $94.6 million achieved in Lot 10, which required extensive negotiation before it was agreed to last February, more than a year after the time the JPO originally projected. Winter aims to have the Lot 12 agreement in place next year. He would like to secure congressional approval for two-year bulk buys, allowing economies of scale in ordering long-lead-time components. This would make it possible for the JPO to reach its objective of achieving a unit cost of $80 million per F-35A by the end of Lot 14. After Lot 14, the JPO may seek authorisation for multi-year contracting.
机译:F-35闪电II联合计划办公室(JPO)计划执行官马特·温特斯海军上将在9月6日在华盛顿由“国防一号”网站组织的座谈会上说,随着F-35采购战斗机的使用率越来越高他们要求的。他说:“尽管问题仍然存在,但我们了解不足之处以及前进的方向。” F-35 JPO的目标是在年底之前完成第11批中74架F-35的交易,将F-35A的单价降低到少于第10批中的9,460万美元,这需要进行大量谈判日本特许厅最初计划的时间已超过一年,直到去年2月才被商定。温特(Winter)的目标是明年达成Lot 12协议。他希望获得两年期大宗采购的国会批准,以便在订购长期交货的组件时实现规模经济。这将使JPO能够实现其目标,在第14批末之前达到每架F-35A 8000万美元的单位成本。在第14批之后,JPO可以寻求多年合同的授权。

著录项

  • 来源
    《Air International》 |2017年第4期|12-12|共1页
  • 作者

    David C Isby;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号