...
机译:灯火寨隧道穿越花岗岩接触区时的突入危害机理研究
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, China;
Faculty of Engineering, China University of Geosciences, Wuhan 430074, China;
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, China;
Faculty of Engineering, China University of Geosciences, Wuhan 430074, China;
Fujian Provincial Expressway Construction Directorate, Fuzhou, Fujian 350001, China;
Tunnel; Inrush hazards; Granite contact zone; Alteration; Triggered conditions; Mechanism;
机译:灯火寨隧道穿越花岗岩接触区时的突入危害机理研究
机译:隧道建设期间花岗岩接触区的改变特性及涌入涌入侵害的处理措施 - 以案例研究
机译:穿过深埋花岗岩的凉山隧道突水灾害的沉积源
机译:高风险海底隧道施工突水危害预警机制研究
机译:在加拿大安大略省格伦维尔前构造带中形成深部花岗岩剪切带的过程
机译:地下水质量特别参考印度南部花岗岩和玄武岩接触区的氟化物浓度
机译:完全风化花岗岩隧道地下水浪涌控制的灌浆设计:实验和现场调查
机译:内华达试验场U12g隧道5号隧道床层接触区样品的岩石学和地球化学特征