...
首页> 外文期刊>ACM Transactions on Modeling and Computer Simulation >Simulation-Based Models of Emergency Departments: Operational, Tactical, and Strategic Staffing
【24h】

Simulation-Based Models of Emergency Departments: Operational, Tactical, and Strategic Staffing

机译:基于仿真的急诊科模型:作战,战术和战略人员配备

获取原文
获取原文并翻译 | 示例

摘要

The Emergency Department (ED) of a modern hospital is a highly complex system that gives rise to numerous managerial challenges. It spans the full spectrum of operational, clinical, and financial perspectives, over varying horizons: operational-a few hours or days ahead; tactical—weeks or a few months ahead; and strategic, which involves planning on monthly and yearly scales. Simulation offers a natural framework within which to address these challenges, as realistic ED models are typically intractable analytically. We apply a general and flexible ED simulator to address several significant problems that arose in a large Israeli hospital. The article focuses mainly, but not exclusively, on workforce staffing problems over these time horizons. First, we demonstrate that our simulation model can support real-time control, which enables short-term prediction and operational planning (physician and nurse staffing) for several hours or days ahead. To this end, we present a novel simulation-based technique that implements the concept of offered-load and discover that it performs better than a common alternative. Then we evaluate ED staff scheduling that adjusts for midterm changes (tactical horizon, several weeks or months ahead). Finally, we analyze the design and staffing problems that arose from physical relocation of the ED (strategic yearly horizon). Application of the simulation-based approach led to the implementation of our design and staffing recommendations.
机译:现代医院的急诊科(ED)是一个高度复杂的系统,带来了众多管理挑战。它涵盖了不同角度的整个运营,临床和财务观点:运营-提前几个小时或几天;战术上的-未来数周或数月;战略性的,涉及按月和按年计划。仿真提供了一个自然的框架来应对这些挑战,因为实际的ED模型通常在分析上很难处理。我们使用通用灵活的ED模拟器来解决以色列一家大型医院中出现的几个重大问题。本文主要(但不仅限于)着眼于这些时间范围内的劳动力配置问题。首先,我们证明了我们的仿真模型可以支持实时控制,从而可以在未来数小时或数天进行短期预测和操作计划(医生和护士的人员配备)。为此,我们提出了一种新颖的基于仿真的技术,该技术实现了提供负载的概念,并且发现它的性能比常见的替代方法更好。然后,我们评估ED员工的日程安排,以适应中期变化(战术范围,提前数周或数月)。最后,我们分析了由ED的实际搬迁(战略年度范围)引起的设计和人员配置问题。基于仿真的方法的应用导致实施了我们的设计和人员配置建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号