A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction

机译:解决施工中时间成本质量权衡问题的新模型

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

A poor quality affects project makespan and its total costs negatively, but it can be recovered by repair works during construction. We construct a new non-linear programming model based on the classic multi-mode resource constrained project scheduling problem considering repair works. In order to obtain satisfactory quality without a high increase of project cost, the objective is to minimize total quality cost which consists of the prevention cost and failure cost according to Quality-Cost Analysis. A binary dependent normal distribution function is adopted to describe the activity quality; Cumulative quality is defined to determine whether to initiate repair works, according to the different relationships among activity qualities, namely, the coordinative and precedence relationship. Furthermore, a shuffled frog-leaping algorithm is developed to solve this discrete trade-off problem based on an adaptive serial schedule generation scheme and adjusted activity list. In the program of the algorithm, the frog-leaping progress combines the crossover operator of genetic algorithm and a permutation-based local search. Finally, an example of a construction project for a framed railway overpass is provided to examine the algorithm performance, and it assist in decision making to search for the appropriate makespan and quality threshold with minimal cost.
机译:质量差会影响项目的工期和总成本,但是可以在施工期间通过维修工作来收回。我们在考虑维修工作的基础上,基于经典的多模式资源受限项目调度问题,构建了一个新的非线性规划模型。为了在不增加项目成本的情况下获得满意的质量,目标是根据质量成本分析,将包括预防成本和故障成本的总质量成本降至最低。采用二进制相关正态分布函数来描述活动质量。根据活动质量之间的不同关系(即协调关系和优先关系),定义累积质量来确定是否启动维修工作。此外,开发了一种改组蛙跳算法,以基于自适应序列计划生成方案和调整后的活动列表来解决此离散权衡问题。在该算法程序中,青蛙学习过程结合了遗传算法的交叉算子和基于置换的局部搜索。最后,提供了一个框架式铁路立交桥建设项目的示例,以检查算法的性能,它有助于决策以最小的成本搜索合适的工期和质量阈值。

著录项

  • 期刊名称 PLoS Clinical Trials
  • 作者

    Fang Fu; Tao Zhang;

  • 作者单位
  • 年(卷),期 2011(11),12
  • 年度 2011
  • 页码 e0167142
  • 总页数 15
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 12:35:39

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号