【2h】

Turbulence and entrainment length scales in large wind farms

机译:大型风电场的湍流和夹带长度尺度

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

A number of large wind farms are modelled using large eddy simulations to elucidate the entrainment process. A reference simulation without turbines and three farm simulations with different degrees of imposed atmospheric turbulence are presented. The entrainment process is assessed using proper orthogonal decomposition, which is employed to detect the largest and most energetic coherent turbulent structures. The dominant length scales responsible for the entrainment process are shown to grow further into the wind farm, but to be limited in extent by the streamwise turbine spacing, which could be taken into account when developing farm layouts. The self-organized motion or large coherent structures also yield high correlations between the power productions of consecutive turbines, which can be exploited through dynamic farm control.This article is part of the themed issue ‘Wind energy in complex terrains’.
机译:使用大型涡流模拟对许多大型风电场进行建模,以阐明夹带过程。提出了没有涡轮机的参考模拟和具有不同程度的强力湍流的三个农场模拟。使用适当的正交分解对夹带过程进行评估,该正交分解用于检测最大和能量最高的相干湍流结构。事实表明,导致夹带过程的主要长度尺度在风电场中会进一步增长,但在一定程度上受到沿流方向的涡轮机间距的限制,在制定农场布局时可以考虑这一点。自组织运动或大型相干结构还会在连续涡轮机的动力产生之间产生高度相关性,这可以通过动态农场控制加以利用。本文是“复杂地形中的风能”主题问题的一部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号