新疆肯斯瓦特水利枢纽导流洞闸门封堵方案

         

摘要

新疆肯斯瓦特水利枢纽工程属于新疆兵团重点水利工程,2009年开工,于2014年12月下闸蓄水。导流洞前后进行了两次封堵,第一次封堵不成功,闸门漏水严重;第二次对封堵方案进行了细致论证,并进行实施,封堵成功,封堵后闸后有少量漏水情况。该文就水库下闸蓄水前,导流洞闸门的封堵方案进行探讨。%Xinjiang Ken Swart water control project is an important engine ering of Xinjiang Production and Construction Corps. The project started in 2009, it was in a condition for reservoir impoundment in December 2014.The diversion tunnel has been blocked twice, the first failed, the situation of leak in sluice gate was serious, then we demonstrated the design of the blocking sluice gate carefully and implemented the plan, the blocking was successful, but the situation of leak was bet-ter after blocking the back gate. The design of the blocking sluice gate of diversion tunnels after the reservoir impound-ment is discussed in this paper.