Combining with Dahui Mountain Tunnel Engineering of new building Xiamen-Shenzhen Railway (Fujian section) Passenger Line, the article presents a construction method which adopts domestic advanced TK600 wet sprayed polyester fibers concrete technology to reinforce fault and fracture wall rock, in order to provide reference for future similar projects.%摘要:结合新建厦深铁路(福建段)客运专线大回山隧道工程实践,介绍了现场施工过程中采用了国内先进的TK600湿喷聚酯纤维混凝土工艺进行断层破碎围岩进行加固处理,供今后类似工程参考.
展开▼