This article analyzes the relationship between construction project cost and duration from the perspective of reducing costs, and explains the basic ideas and methods to optimize the construction period in detail with specific examples.%本文从降低费用的角度,分析建设工程施工费用与工期的关系,并以具体实例详细说明工程工期优化的基本思路及其方法.
展开▼