Thrust system plays a vital role in the integrated coal mining equipment; the design of Limit Stop on the base block structure is the top priority of it.The paper launched design studies to three kinds of base block structure, and analyzed its manufacturability and then completed the rational design.%推移系统在整个综采成套设备中起着至关重要的作用,底座挡块的结构设计是它的重中之重.本文对三种挡块结构进行了设计研究,并对其工艺性分析,完成了底座挡块结构的合理性设计.
展开▼