The key technology of high pier construction was deeply studied, combining with bridge flexible thin-walled hollow high pier construction of Baofu Heiyagou, and a series of construction techniques were adopted in this paper. The safety technical measures of rasine hurricane-span high bridge pier construction were also proposed to provide mature experience for similar project.%本文结合保阜黑崖沟特大桥柔性薄壁空心高墩施工,对高墩施工关键技术进行了深入研究,采用一系列施工技术,提出深谷飓风高墩大跨桥梁施工安全技术措施,为类似项目提供成熟经验.
展开▼